Skip to content
WorkspaceLet's simulate→
CortexSim/Use cases/Network change planning
Operations / Network change planning

Change one path.
Trace the consequence.

Explore route, delay, queue and failure assumptions in a network model linked to retained observations.

Design your evaluation
01Retain unobserved dependencies02Compare a fixed workload03Record calibration uncertainty
The topology alternative
The topology alternative — Observed pathPin a source-linked topology and record relationships that have not been observed.DECLARED TOPOLOGY / RETAIN OBSERVATION GAPSABCDEFPin the observed path
Interactive concept illustration · authored examples, not measured results
01/ 03
Observed path

Pin a source-linked topology and record relationships that have not been observed.

THE BUSINESS DECISION

What is the downstream effect of a topology change?

Explore the supporting capability

A topology change can shift delay, queues and failure exposure beyond the service that requested it. An observed path is also not the same as a complete physical or logical map. Useful planning retains both the candidate topology and the limits of the observation.

WHEN THIS MATTERS

A route, topology, service placement or failure-domain change may affect a critical transaction path.

A DECISION NEEDS EVIDENCE
BRING THESE PERSPECTIVESNetwork architectService ownerPerformance engineerChange reviewer

Select a source-linked topology and record unobserved dependencies.

THE CHECK

Retain unobserved dependencies

THE ARTIFACT TO RETAIN

Versioned topology alternatives

INSIDE THE DECISION

A service is proposed for a different network segment.

Authored scenario · not a customer case study
01

The hidden risk

The new route looks shorter, but a shared dependency introduces a different queue or failure domain.

02

The experiment

Compare retained and candidate paths with the same authored traffic and inspect downstream sensitivity.

03

The review conversation

A topology comparison tied to source observations, workload assumptions and remaining calibration questions.

FROM QUESTION TO EVIDENCE

A method your reviewers can follow.

Explore route, delay, queue and failure assumptions in a network model linked to retained observations.

01

Select a source-linked topology and record unobserved dependencies.

QUESTION TO RESOLVE

Retain unobserved dependencies

ARTIFACT TO RETAIN

Versioned topology alternatives

02

Change one route, delay or failure assumption at a time.

QUESTION TO RESOLVE

Compare a fixed workload

ARTIFACT TO RETAIN

Sensitivity comparisons

03

Compare seeded outcomes and calibrate against available measurements.

QUESTION TO RESOLVE

Record calibration uncertainty

ARTIFACT TO RETAIN

Explicit calibration gaps

WORK WITH YOUR EXISTING SYSTEMS

Keep the source. Make the boundary explicit.

Modeled packet or service behavior depends on declared profiles and calibration. It is not automatic qualification of a production network.

Explore MCP connectivity
YOUR ENVIRONMENTObserved topologyReviewed source and access scope
SIMULATION BOUNDARYQueue assumptionsRecord calibration uncertainty

MCP can expose permitted simulation tools and evidence to an approved client. Source adapters, grants and deployment compatibility must be reviewed separately.

BUILD YOUR EVALUATION BRIEF

Decide what the evidence must answer.

One source-linked topology, one bounded change and a retained transaction workload.

Select the checks to include in your downloadable planning brief. This prepares a scope; it does not run a simulation.

3 checks selected
Checks for your evaluation
BEFORE YOU BEGIN

Set expectations with the whole team.

What should our first evaluation include?

One source-linked topology, one bounded change and a retained transaction workload.

What does this evidence not establish?

Modeled packet or service behavior depends on declared profiles and calibration. It is not automatic qualification of a production network.

What should an independent reviewer inspect?

Retain the observation source and the areas where the modeled behavior still needs measurement.

LEARN BEFORE THE DECISION BECOMES EXPENSIVE

Bring a real question. Leave with an evaluation plan.

One source-linked topology, one bounded change and a retained transaction workload.

Frame your evaluation