Choose the operating boundary
Review the intended customer environment, private source connections and identity configuration. Hybrid and disconnected designs need their own acceptance evidence.
Describe where the control plane, source connectors, data and custody live. Record the intended identity configuration and network paths. Customer-hosted, hybrid and disconnected arrangements have different operating assumptions; an architecture diagram does not establish acceptance of any one of them.
- Document ingress, egress and source networks.
- Agree credential custody and rotation ownership.
- Identify protocol and connector versions.
Qualify operational behavior
Local implementation evidence is useful but does not establish customer production load, disaster recovery or multi-host behavior.
Use the exact deployed artifact and declared workload when collecting operational evidence. A backup file alone does not demonstrate a valid restore, and a process restart does not demonstrate independent-site recovery. Distinguish measured outcomes from assumptions in the release review.
Internal evidence and customer qualification are separate gates
Identify the exact runtime, configuration and provenance under review.
- Test backup and restore against agreed targets.
- Validate sustained load and resource limits.
- Review incident response, retention and revocation behavior.
Make acceptance explicit
Bring technical and business reviewers together around the exact deployed artifact and declared workload.
Acceptance belongs to the accountable reviewers for the intended environment. Preserve the evidence package and any exceptions, including their owner and resolution condition. Do not replace an unresolved production gate with an internal pass that answered a narrower question.
What does a successful internal cold restore demonstrate?
Restore the retained internal package into a separate owned environment with its required custody. Verify identities, acknowledged state and representative workflows against the declared internal contract.
The result supports that bounded restore procedure. It does not establish multi-host promotion, independent-site recovery or the availability of a customer deployment.
- Retain artifact inventories and provenance.
- Resolve independent security and accessibility gates.
- Record remaining exceptions and accountable owners.
Understand the current internal boundary
The recorded D5 scope is internal use, with local build, installation, control, bounded-load and recovery evidence. Production deployment and qualification are deferred. Internal evidence is useful for planning the next gate, but it does not expand the deployment boundary by itself.
Customer qualification still includes representative interfaces and identity, sustained workloads, physical-host and independent-site recovery, and independent security, domain and accessibility assessment. Review the exact evidence required for the proposed environment.
Keep delivery scope explicit
| Evidence level | What is reviewed | Remaining boundary |
|---|---|---|
| Internal-use evidence | Recorded local implementation and bounded qualification. | Customer production remains deferred. |
| Customer environment evidence | Chosen identity, interfaces, network and operations. | Only the declared deployment profile is covered. |
| Release acceptance | Accountable review of the complete evidence package. | Exceptions and unresolved gates remain visible. |
- Label internal and customer evidence separately.
- Keep the deployed artifact and configuration pinned.
- Record unobserved or incomplete external checks honestly.
Treat restore protection as part of operations
For a custody-bound environment, recovery needs the compatible runtime and independently retained custody journal as well as the application database. An older backup may predate erasure or other custody decisions.
Qualify a restore into a separate owned environment before switching service. Preserve original backups, failed outcomes and custody records. Customer retention, credential custody and incident procedures need their own operating review.
Keep the evidence and its conditions together. A later success does not erase an earlier failure or broaden the original scope.
- Verify restored identity and business workflows.
- Retain evidence from upgrade, rollback and restart.
- Do not infer customer disaster recovery from one local restore.
Prepare the release review package
Bring the exact artifact, configuration, declared workload, operational evidence and independent assessments to the review. Make unresolved exceptions and their impact easy to find.
This checklist records preparation only. Completing it does not authorize a release or establish production readiness. Production work remains deferred until deployment is planned and its required qualification is completed.
Review preparation
0 / 6 prepared- Name accountable technical and business reviewers.
- Document exceptions and resolution conditions.
- Record the release decision outside this planning checklist.